Por favor, use este identificador para citar o enlazar este ítem: http://localhost:8080/jspui/handle/123456789/643
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorLicuy Alvarado, Stalin Manuel-
dc.contributor.authorShiguango Yumbo, Bryan Bladimir-
dc.date.accessioned2026-04-01T21:22:00Z-
dc.date.available2026-04-01T21:22:00Z-
dc.date.issued2026-04-01-
dc.identifier.otherISTT-EX-0011-2025-
dc.identifier.urihttp://localhost:8080/jspui/handle/123456789/643-
dc.descriptionEl proyecto de titulación tuvo como objetivo diseñar e implementar un plan de mantenimiento para el cuarto de servidores del Instituto Superior Tecnológico Tena, enfocado en optimizar el cableado estructurado, la ventilación y las condiciones eléctricas. Se identificaron como problemas la desorganización del cableado, la ventilación deficiente y riesgos eléctricos que afectaban la seguridad y continuidad de los servicios. Mediante un enfoque cuantitativo-descriptivo, con entrevistas al personal y revisiones visuales, se determinó que el 78% consideró deficiente la organización del cableado, el 65% reportó ventilación inadecuada y el 72% mostró preocupación por el sistema eléctrico. El plan técnico implementado, con cronogramas, presupuestos y recomendaciones normativas, redujo riesgos, mejoró el flujo de aire en un 60% y optimizó el cableado en un 80%. Se concluye que un mantenimiento planificado y periódico es esencial para garantizar la seguridad y operatividad del cuarto de servidores, fortaleciendo la gestión tecnológica institucional.es
dc.description.abstractThe degree project aimed to design and implement a maintenance plan for the server room of the Instituto Superior Tecnológico Tena, focused on optimizing structured cabling, ventilation, and electrical conditions. The main issues identified were disorganized cabling, poor ventilation, and electrical risks affecting the safety and continuity of services. Through a quantitative-descriptive approach, including staff interviews and visual inspections, it was determined that 78% considered the cabling organization deficient, 65% reported inadequate ventilation, and 72% expressed concerns about the electrical system. The implemented technical plan, which included schedules, budgets, and regulatory recommendations, reduced risks, improved airflow by 60%, and optimized cabling by 80%. It is concluded that planned and periodic maintenance is essential to ensure the safety and operability of the server room, strengthening the institution's technological management.es
dc.language.isoeses
dc.subjectcuarto de servidoreses
dc.subjectmantenimiento preventivoes
dc.subjectcableado estructuradoes
dc.subjectventilaciónes
dc.subjectcondiciones eléctricases
dc.subjectinfraestructura tecnológicaes
dc.title"Diseño e implementación de un plan de mantenimiento para el cuarto de servidores del Instituto Superior Tecnológico Tena, orientado a mejorar, optimizar el cableado, ventilación y condiciones eléctricas"es
Aparece en las colecciones: DESARROLLO INFANTIL INTEGRAL

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Trabajo de integración curricular.pdf7,04 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.